Gas Transmission and Distribution Piping Systems

ASME B31.8-2014 (Revision of ASME B31.8-2012) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 ... 2014 by the Amer...

0 downloads 3 Views 585KB Size

Recommend Documents

Bonding Requirements For Gas Piping Systems Bob Torbin February 2008 • Why do we bond and ground systems? • What are the requirements in the codes?

one phase is short circuited to ground. This type of fault may occur due to lightning strikes, debris, pollution effects, animals and vegetation. Other types of faults such as three-phase to ground, double earth fault are also considered in short cir

capacitor banks is a cost effective manner to increase capacity, but as the voltages change within the distribution range, the optimum placement, sizing and fusing technology of the capacitor banks also changes. Shunt capacitor banks reduce current E

To test the capacitor in a string of the next group, lower the test voltage to zero and move all test leads Testing capacitor banks using the M4000 test instrument by Long Pong, Doble Engineering Testing a capacitor bank used to be a tedious and time

US Shale Basins and their Natural Gas Resource Base (Tcf)1. ... Bcf/d Utica natural gas production could reach ~2.8 Bcf/d by 2016 and ~ 4.0 Bcf/d by 2020 in our base case. Agenda 13 Project Introduction ... NEXUS Gas Transmission gives producers acce

fgp-001can 09/15 ©omega flex, inc. september 2015 residential • commercial • industrial canadian flexible gas piping design guide & installation

enforcement officials. CSST is a thin wall, flexible gas-piping product that can be both mechanically and electrically damaged if proper installation precautions are not taken. This presentation will address the basic components of a CSST system, the

bead and the hot pass when the hardness of the root pass is a con- cern, even if other higher strength consumables are to be used to fill and cap the weld. This “softer” root increases the resistance to cer-

Peak short-circuit current: l KS If the short-circuit begins at an instant near to the voltage zero crossing, a DC component is present in addition to the AC current. This,together with the initial symmetrical short-circuit current form the peak shor

1910.269(a)(1)(i) This section covers the operation and maintenance of electric power generation, control, transformation, transmission, and distribution lines and equipment.